Five-year program for roads, drainage, river training and housing planning.
Five-year program for roads, drainage, river training and housing planning.
Client: ADB
Dzongkhag: Thimphu, Phuentsholing
Service Category: Urban Infrastructure
Status: Completed
Feasibility/design for drainage, water, solid waste and urban improvements.
Client: World Bank
Dzongkhag: Ten towns (National)
Service Category: Urban Infrastructure
Status: Completed
Policy reforms to improve access to safe, affordable housing.
Client: ADB
Dzongkhag: National (Urban Housing)
Service Category: Urban Infrastructure
Status: Completed
Prepare implementation program for municipal infrastructure and services.
Client: ADB
Dzongkhag: Thimphu, Phuentsholing, Dagana
Service Category: Urban Infrastructure
Status: Completed
Develop national urban strategy and TCDS with environmental components.
Client: World Bank
Dzongkhag: National (focus Thimphu, Phuentsholing)
Service Category: Urban Infrastructure
Status: Completed
Strengthen municipalities with water, sewer, stormwater and urban systems.
Client: DANIDA
Dzongkhag: Sarpang (Gelephu), Tsirang, Samtse
Service Category: Urban Infrastructure
Status: Completed
Elegant four-lane steel arch bridge—design and construction supervision.
Client: ADB
Dzongkhag: Thimphu
Service Category: Transport
Status: Completed
Design, cost estimates and supervision for 150 m viaduct/flyover.
Client: ADB
Dzongkhag: Thimphu
Service Category: Transport
Status: Completed
Design and supervise RCC bridges with topo and sub-soil investigations.
Client: ADB
Dzongkhag: Mongar / Pemagatshel
Service Category: Transport
Status: Completed
Survey, design and supervision of two 35 m RCC bridges.
Client: ADB
Dzongkhag: Mongar / Pemagatshel
Service Category: Transport
Status: Completed
Supervise construction of 200 m steel arch bridge with QA/QC and billing reviews.
Client: ADB
Dzongkhag: Chukha / Samtse
Service Category: Transport
Status: Completed
Design and supervise 152 m steel arch bridge over Dangmechu.
Client: ADB
Dzongkhag: Zhemgang (Panbang)
Service Category: Transport
Status: Completed
Pilot grid-connected residential solar PV with tariff framework and livelihood training.
Client: ADB / JFPR
Dzongkhag: Multiple rural dzongkhags
Service Category: Sustainable Resources
Status: Completed
ESIA/ESMP for integrated hydropower and water-supply initiative in Paro basin.
Client: DoE
Dzongkhag: Paro
Service Category: Sustainable Resources
Status: Completed
Watershed, flood hazard and mitigation design with landscape and environmental plans.
Client: UNDP and Phuentsholing Thromde
Dzongkhag: Chukha
Service Category: SUSTAINABLE SECTOR - HYDROLOGY AND HYDRAULIC MODEL PROJECTS
Status: Complete
Surveys and hydraulic modeling for flood and bank protection of Amochhu development area.
Client: ADB and CDCL, DHI Infra Ltd.
Dzongkhag: Chukha
Service Category: SUSTAINABLE SECTOR - 2D Hydraulic Modelling
Status: Complete
Hydraulic study and updated flood model of Om Chhu considering cumulative ADB works.
Client: ADB & Phuentsholing Thromde
Dzongkhag: Chukha
Service Category: Sustainable Sector - Hydraulic Study and Modelling
Status: Complete
We value meaningful partnerships and welcome the opportunity to discuss your projects. Our team is ready to provide the expertise, precision, and integrity required to deliver results that meet the highest international standards.